Tuesday, December 29, 2020

Backus, MN: Water Protectors Blockade Line 3 Pipe-Yard

The post Backus, MN: Water Protectors Blockade Line 3 Pipe-Yard appeared first on It's Going Down.

Action report on recent blockade of Line 3 pipe-yard from the Giniw Collective. Monday morning, a water protector bravely ascended a tripod high in the air blockading an Enbridge pipe-yard, as dozens of supporters held space below. Since giving the final green light on November 30th for Enbridge to bulldoze through Minnesota’s watersheds for its... Read Full Article


by via It's Going Down

No comments:

Post a Comment

SUNO v6 is now a tool, not a slop generator

  Generative Music Production with Suno v6 and v6-Wild: Engineering Workflows, Latent Parameter Controls, and Acoustic Architectures The com...